IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0009 # 05 Y:2012 05 2012 CHANGE PRODUCT SPECS $11,780 $0 Not Implemented
WM0009 # 06 Y:2012 06 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $12,250 $19,000 Not Implemented
WM0007 # 01 Y:2012 01 2012 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,505 $0 Not Implemented
WM0007 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $125 Implemented
WM0007 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,646 $0 Not Implemented
WM0007 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,789 $250 Not Implemented
WM0007 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,041 $200 Not Implemented
WM0007 # 06 Y:2012 06 2012 INSTALL SKYLIGHTS $34,161 $123,125 Not Implemented
WM0008 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $16,760 $0 Not Implemented
WM0008 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $8,834 $0 Not Implemented
WM0008 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,802 $0 Not Implemented
WM0008 # 04 Y:2012 04 2012 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $40,676 $83,400 Not Implemented
WM0008 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,551 $1,000 Not Implemented
WM0008 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,737 $0 Not Implemented
WM0008 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $432 $520 Not Implemented
WM0008 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $1,209 $990 Not Implemented
WM0008 # 09 Y:2012 09 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,137 $3,034 Not Implemented
WM0008 # 10 Y:2012 10 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $840 $400 Not Implemented
WM0003 # 01 Y:2012 01 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,254 $600 Implemented
WM0003 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $2,091 $0 Not Implemented
WM0003 # 03 Y:2012 03 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,223 $0 Not Implemented
WM0003 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $120 Implemented
WM0003 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $360 Implemented
WM0003 # 06 Y:2012 06 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $493 $99 Not Implemented
WM0003 # 07 Y:2012 07 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,160 $900 Not Implemented