Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0630 # 04 Y:2001 | 04 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $3,432 | $700 | Not Implemented |
UD0630 # 05 Y:2001 | 05 | 2001 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,639 | $500 | Implemented |
UD0630 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,272 | $88 | Implemented |
UD0630 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $611 | $1,180 | Implemented |
UD0630 # 08 Y:2001 | 08 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $300 | $0 | Not Implemented |
IC0013 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,363 | $1,800 | n/a |
IC0013 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $573 | $0 | n/a |
IC0013 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $218 | $1,137 | n/a |
IC0013 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $509 | $2,428 | n/a |
IC0013 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $338 | $995 | n/a |
IC0013 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $189 | $639 | n/a |
IC0013 # 07 Y:2001 | 07 | 2001 | INSTALL SET-BACK TIMERS | $4,781 | $870 | n/a |
IC0013 # 08 Y:2001 | 08 | 2001 | INSULATE BARE EQUIPMENT | $74 | $159 | n/a |
IC0013 # 09 Y:2001 | 09 | 2001 | $5,550 | $1,040 | n/a | |
LL0116 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,494 | $1,440 | Implemented |
LL0116 # 02 Y:2001 | 02 | 2001 | REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS | $2,754 | $1,480 | Not Implemented |
LL0116 # 03 Y:2001 | 03 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,478 | $1,000 | Not Implemented |
LL0116 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $16,464 | $3,385 | Implemented |
LL0116 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,464 | $0 | Implemented |
LL0116 # 06 Y:2001 | 06 | 2001 | OPTIMIZE PLANT POWER FACTOR | $17,053 | $23,870 | Not Implemented |
GT0718 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,000 | $0 | n/a |
GT0718 # 02 Y:2001 | 02 | 2001 | COMBINE UTILITY METERS | $2,360 | $0 | n/a |
GT0718 # 03 Y:2001 | 03 | 2001 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $645 | $0 | n/a |
GT0718 # 04 Y:2001 | 04 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $1,625 | $7,000 | n/a |
GT0718 # 05 Y:2001 | 05 | 2001 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $35,705 | $3,500 | n/a |