Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0258 # 12 Y:2004 | 12 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $652 | $432 | Not Implemented |
WI0476 # 01 Y:2004 | 01 | 2004 | BURN WASTE OIL FOR HEAT | $73,937 | $36,000 | Not Implemented |
WI0476 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $15,807 | $21,000 | Not Implemented |
WI0476 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,856 | $8,856 | Not Implemented |
WI0476 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $5,082 | $2,944 | Not Implemented |
WI0476 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,557 | $4,280 | Implemented |
WI0476 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,148 | $0 | Implemented |
WI0476 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,141 | $640 | Implemented |
WI0476 # 08 Y:2004 | 08 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $308 | $776 | Not Implemented |
WV0302 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,584 | $3,731 | Implemented |
WV0302 # 02 Y:2004 | 02 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,141 | $0 | Implemented |
WV0302 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,134 | $292 | Implemented |
WV0302 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,072 | $7,735 | Implemented |
WV0302 # 05 Y:2004 | 05 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,067 | $7,050 | Not Implemented |
WV0302 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,066 | $2,200 | Implemented |
WV0302 # 07 Y:2004 | 07 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,889 | $80 | Implemented |
WV0302 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,260 | $50 | Implemented |
WV0302 # 09 Y:2004 | 09 | 2004 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,096 | $1,967 | Not Implemented |
WV0302 # 10 Y:2004 | 10 | 2004 | INSTALL OCCUPANCY SENSORS | $921 | $1,400 | Implemented |
WV0302 # 11 Y:2004 | 11 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $731 | $300 | Implemented |
WV0302 # 12 Y:2004 | 12 | 2004 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $28,080 | $100 | Implemented |
WV0302 # 13 Y:2004 | 13 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,450 | $5,000 | Implemented |
AS0386 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,031 | $120 | Implemented |
AS0386 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,011 | $15 | Implemented |
AS0386 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $639 | $1,350 | Implemented |