IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0342 # 13 Y:2012 13 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $72,444 $410,000 Implemented
LE0342 # 14 Y:2012 14 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,722 $85,000 Implemented
WM0007 # 01 Y:2012 01 2012 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,505 $0 Not Implemented
WM0007 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $125 Implemented
WM0007 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,646 $0 Not Implemented
WM0007 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,789 $250 Not Implemented
WM0007 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,041 $200 Not Implemented
WM0007 # 06 Y:2012 06 2012 INSTALL SKYLIGHTS $34,161 $123,125 Not Implemented
MA0698 # 01 Y:2012 01 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,300 $1,000 Not Implemented
MA0698 # 02 Y:2012 02 2012 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $8,226 $6,500 Not Implemented
MA0698 # 03 Y:2012 03 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,992 $28,000 Not Implemented
MA0698 # 04 Y:2012 04 2012 REDESIGN PROCESS $7,448 $22,500 Not Implemented
MA0698 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,082 $4,410 Not Implemented
MA0698 # 06 Y:2012 06 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,103 $5,900 Not Implemented
MA0698 # 07 Y:2012 07 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,076 $9,870 Not Implemented
UA0084 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,489 $160 Implemented
UA0084 # 02 Y:2012 02 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,919 $640 Not Implemented
UA0084 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,106 $2,157 Implemented
UA0084 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,492 $9,195 Implemented
UA0084 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,491 $800 Not Implemented
UA0084 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,837 $4,093 Not Implemented
UA0084 # 07 Y:2012 07 2012 PAY UTILITY BILLS ON TIME $812 $30 Implemented
UM0407 # 01 Y:2012 01 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $7,773 $15,000 Not Implemented
UM0407 # 02 Y:2012 02 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,427 $2,000 Implemented
UM0407 # 03 Y:2012 03 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,006 $8,000 Implemented