Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0006 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,100 | $0 | Implemented |
NL0006 # 04 Y:2017 | 04 | 2017 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,082 | $4,000 | Implemented |
NL0006 # 05 Y:2017 | 05 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,213 | $0 | Implemented |
BS0099 # 01 Y:2017 | 01 | 2017 | RECOVER AND REUSE WASTE MATERIAL | $83,061 | $200,000 | Not Implemented |
BS0099 # 02 Y:2017 | 02 | 2017 | ADOPT IN-HOUSE MATERIAL GENERATION | $7,623 | $60,000 | Not Implemented |
BS0099 # 03 Y:2017 | 03 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $866 | $2,440 | Not Implemented |
BS0099 # 04 Y:2017 | 04 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $789 | $144 | Not Implemented |
BS0099 # 05 Y:2017 | 05 | 2017 | TREAT AND REUSE RINSE WATERS | $773 | $7,514 | Not Implemented |
BS0099 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $456 | $7 | Not Implemented |
BS0099 # 07 Y:2017 | 07 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $428 | $308 | Not Implemented |
BS0099 # 08 Y:2017 | 08 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $135 | $13 | Not Implemented |
BS0099 # 09 Y:2017 | 09 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $50 | $260 | Not Implemented |
OK0971 # 01 Y:2017 | 01 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,220 | $14,212 | Not Implemented |
OK0971 # 02 Y:2017 | 02 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $654 | $1,913 | Not Implemented |
OK0971 # 03 Y:2017 | 03 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $199 | $468 | Not Implemented |
OK0971 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,254 | $39,396 | Implemented |
OK0971 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,570 | $10,263 | Implemented |
OK0971 # 06 Y:2017 | 06 | 2017 | OPTIMIZE PLANT POWER FACTOR | $19,022 | $4,357 | Not Implemented |
OK0971 # 07 Y:2017 | 07 | 2017 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $15,676 | $0 | Not Implemented |
OK0971 # 08 Y:2017 | 08 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,433 | $1,608 | Not Implemented |
OK0971 # 09 Y:2017 | 09 | 2017 | INSTALL SET-BACK TIMERS | $977 | $1,306 | Implemented |
AS0435 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,295 | $200 | Not Implemented |
AS0435 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,087 | $5,774 | Not Implemented |
AS0435 # 03 Y:2017 | 03 | 2017 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,510 | $60 | Not Implemented |
AS0435 # 04 Y:2017 | 04 | 2017 | MINIMIZE WATER USAGE | $912 | $2,243 | Not Implemented |