IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0006 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,100 $0 Implemented
NL0006 # 04 Y:2017 04 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,082 $4,000 Implemented
NL0006 # 05 Y:2017 05 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,213 $0 Implemented
BS0099 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $83,061 $200,000 Not Implemented
BS0099 # 02 Y:2017 02 2017 ADOPT IN-HOUSE MATERIAL GENERATION $7,623 $60,000 Not Implemented
BS0099 # 03 Y:2017 03 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $866 $2,440 Not Implemented
BS0099 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $789 $144 Not Implemented
BS0099 # 05 Y:2017 05 2017 TREAT AND REUSE RINSE WATERS $773 $7,514 Not Implemented
BS0099 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $456 $7 Not Implemented
BS0099 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $428 $308 Not Implemented
BS0099 # 08 Y:2017 08 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $135 $13 Not Implemented
BS0099 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $50 $260 Not Implemented
OK0971 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,220 $14,212 Not Implemented
OK0971 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $654 $1,913 Not Implemented
OK0971 # 03 Y:2017 03 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $199 $468 Not Implemented
OK0971 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,254 $39,396 Implemented
OK0971 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,570 $10,263 Implemented
OK0971 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $19,022 $4,357 Not Implemented
OK0971 # 07 Y:2017 07 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,676 $0 Not Implemented
OK0971 # 08 Y:2017 08 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,433 $1,608 Not Implemented
OK0971 # 09 Y:2017 09 2017 INSTALL SET-BACK TIMERS $977 $1,306 Implemented
AS0435 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,295 $200 Not Implemented
AS0435 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,087 $5,774 Not Implemented
AS0435 # 03 Y:2017 03 2017 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,510 $60 Not Implemented
AS0435 # 04 Y:2017 04 2017 MINIMIZE WATER USAGE $912 $2,243 Not Implemented