Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0326 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,106 | $2,244 | Implemented |
MZ0326 # 07 Y:2022 | 07 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $597 | $580 | Implemented |
MZ0326 # 08 Y:2022 | 08 | 2022 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $116,541 | $552,315 | Not Implemented |
MZ0326 # 09 Y:2022 | 09 | 2022 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $10,442 | $18,650 | Not Implemented |
MZ0326 # 10 Y:2022 | 10 | 2022 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,954 | $1,170 | Not Implemented |
MZ0326 # 11 Y:2022 | 11 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $384,733 | $2,868,753 | Implemented |
MZ0326 # 12 Y:2022 | 12 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,151 | $600 | Not Implemented |
MU0007 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,417 | $10,160 | Implemented |
MU0007 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,200 | $7,825 | Not Implemented |
MU0007 # 03 Y:2022 | 03 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,914 | $0 | Implemented |
MU0007 # 04 Y:2022 | 04 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,004 | $0 | Implemented |
MU0007 # 05 Y:2022 | 05 | 2022 | INSTALL SET-BACK TIMERS | $612 | $541 | Not Implemented |
MU0007 # 06 Y:2022 | 06 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $12 | $44 | Implemented |
UD1044 # 01 Y:2022 | 01 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,822 | $0 | Not Implemented |
UD1044 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $704 | $0 | Not Implemented |
UD1044 # 03 Y:2022 | 03 | 2022 | REDUCE VENTILATION AIR | $6,187 | $750 | Not Implemented |
UD1044 # 04 Y:2022 | 04 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $318 | $0 | Implemented |
UD1044 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $1,611 | $900 | Not Implemented |
UD1044 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,125 | $2,940 | Not Implemented |
KS2203 # 01 Y:2022 | 01 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,958 | $5,101 | Implemented |
KS2203 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,131 | $0 | Implemented |
KS2203 # 03 Y:2022 | 03 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $27,117 | $60,601 | Not Implemented |
KS2203 # 04 Y:2022 | 04 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $98,216 | $570,000 | Implemented |
KS2203 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,656 | $5,480 | Implemented |
KS2203 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,676 | $45 | Implemented |