Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0421 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,035 | $9,615 | Not Implemented |
MA0427 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,186 | $19,050 | Implemented |
MA0427 # 02 Y:1998 | 02 | 1998 | OPTIMIZE PLANT POWER FACTOR | $5,715 | $7,055 | Implemented |
MA0427 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,885 | $242 | Not Implemented |
MA0427 # 04 Y:1998 | 04 | 1998 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $4,093 | $4,800 | Not Implemented |
MA0427 # 05 Y:1998 | 05 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,533 | $2,700 | Not Implemented |
MA0427 # 06 Y:1998 | 06 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,828 | $426 | Implemented |
MA0427 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,159 | $1,840 | Not Implemented |
MA0427 # 08 Y:1998 | 08 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $836 | $200 | Implemented |
MA0424 # 01 Y:1998 | 01 | 1998 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $263,073 | $1,000,000 | Not Implemented |
MA0424 # 02 Y:1998 | 02 | 1998 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,538 | $30,400 | Implemented |
MA0424 # 03 Y:1998 | 03 | 1998 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,197 | $21,808 | Not Implemented |
MA0424 # 04 Y:1998 | 04 | 1998 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $12,411 | $10,638 | Not Implemented |
MA0424 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,568 | $0 | Implemented |
MA0424 # 06 Y:1998 | 06 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,474 | $5,800 | Not Implemented |
MA0419 # 01 Y:1998 | 01 | 1998 | COVER OPEN TANKS | $168,295 | $5,000 | Implemented |
MA0419 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,360 | $118,235 | Implemented |
MA0419 # 03 Y:1998 | 03 | 1998 | ADJUST BURNERS FOR EFFICIENT OPERATION | $36,192 | $201,500 | Not Implemented |
MA0419 # 04 Y:1998 | 04 | 1998 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $10,000 | $3,120 | Implemented |
MA0419 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,822 | $9,000 | Implemented |
MA0419 # 06 Y:1998 | 06 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,967 | $0 | Implemented |
MA0419 # 07 Y:1998 | 07 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,739 | $0 | Implemented |
MA0419 # 08 Y:1998 | 08 | 1998 | OPTIMIZE PLANT POWER FACTOR | $2,539 | $7,125 | Not Implemented |
MA0418 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $46,132 | $1,000,000 | Not Implemented |
MA0418 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,390 | $35,000 | Not Implemented |