IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0311 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,804 $2,332 Not Implemented
SF0311 # 10 Y:2005 10 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,402 $5,030 Not Implemented
SF0311 # 11 Y:2005 11 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $456 $693 Not Implemented
SF0311 # 12 Y:2005 12 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,102 $18,405 Not Implemented
SF0311 # 13 Y:2005 13 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $345 $658 Not Implemented
SF0311 # 14 Y:2005 14 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $22,029 $46,851 Not Implemented
SF0311 # 15 Y:2005 15 2005 MODIFY STARTUP/SHUTDOWN TIMES $3,118 $13,200 Not Implemented
SF0311 # 16 Y:2005 16 2005 ELIMINATE/REDUCE AN OPERATION $1,600 $0 Not Implemented
SF0311 # 17 Y:2005 17 2005 REUSE / RECYCLE/ SELL PAPER PRODUCTS $19,680 $12,330 Implemented
WV0321 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,415 $1,613 Implemented
WV0321 # 02 Y:2005 02 2005 UPGRADE CONVEYORS $2,844 $4,000 Not Implemented
WV0321 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,508 $9,090 Implemented
WV0321 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,125 $454 Implemented
WV0321 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $25 Implemented
WV0321 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $2,650 Implemented
WV0321 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,340 $210 Not Implemented
WV0321 # 08 Y:2005 08 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,323 $1,782 Not Implemented
WV0321 # 09 Y:2005 09 2005 DEVELOP A REPAIR/REPLACE POLICY $875 $312 Implemented
WV0321 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $532 $140 Not Implemented
WV0320 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,626 $30,000 Implemented
WV0320 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,978 $5,805 Implemented
WV0320 # 03 Y:2005 03 2005 BURN WASTE OIL FOR HEAT $4,770 $4,000 Not Implemented
WV0320 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $4,359 $4,750 Implemented
WV0320 # 05 Y:2005 05 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,094 $2,700 Implemented
WV0320 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,232 $0 Not Implemented