IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0110 # 04 Y:2013 04 2013 REDUCE VENTILATION AIR $4,577 $102 Not Implemented
DL0110 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $24,800 Not Implemented
DL0110 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,991 $152 Not Implemented
DL0110 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,943 $644 Not Implemented
IA0500 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $710 Implemented
IA0500 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,170 $105 Not Implemented
IA0500 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,050 $2,500 Not Implemented
IA0500 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $413 $1,388 Implemented
IA0500 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $19,132 $8,000 Not Implemented
IA0500 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,973 $1,700 Implemented
IA0500 # 07 Y:2013 07 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,980 $22,500 Not Implemented
IA0500 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $2,461 $210 Implemented
IA0500 # 09 Y:2013 09 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $280 $110 Not Implemented
IA0500 # 10 Y:2013 10 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,264 $15,781 Implemented
IA0500 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,837 $16,072 Implemented
NC0487 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,586 $9,967 Implemented
NC0487 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $143 $812 Implemented
NC0487 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $301 $100 Implemented
NC0487 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $840 Implemented
NC0487 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $736 $1,200 Not Implemented
NC0487 # 06 Y:2013 06 2013 USE RADIANT HEATER FOR SPOT HEATING $564 $1,325 Not Implemented
NC0487 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $202 $50 Not Implemented
UM0430 # 01 Y:2013 01 2013 RECOVER MECHANICAL ENERGY $45,000 $8,000 Not Implemented
UM0430 # 02 Y:2013 02 2013 RECOVER MECHANICAL ENERGY $18,100 $15,500 Not Implemented
UM0430 # 03 Y:2013 03 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,100 $5,500 Not Implemented