Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0435 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $787 | $60 | Not Implemented |
AS0435 # 06 Y:2017 | 06 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $780 | $325 | Not Implemented |
MZ0231 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,949 | $28,500 | Implemented |
MZ0231 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,265 | $12,363 | Implemented |
MZ0231 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,125 | $30 | Implemented |
MZ0231 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $713 | $250 | Implemented |
MZ0231 # 05 Y:2017 | 05 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,356 | $8,300 | Not Implemented |
MZ0231 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,438 | $11,250 | Implemented |
MZ0231 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $20,503 | $34,150 | Implemented |
MZ0231 # 08 Y:2017 | 08 | 2017 | INSULATE BARE EQUIPMENT | $3,785 | $21,000 | Implemented |
MI0315 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $60,269 | $1,660 | Implemented |
MI0315 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $28,850 | $36,000 | Implemented |
MI0315 # 03 Y:2017 | 03 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $23,532 | $1,560 | Not Implemented |
MI0315 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,687 | $960 | Implemented |
MI0315 # 05 Y:2017 | 05 | 2017 | USE OPTIMUM THICKNESS INSULATION | $10,994 | $1,320 | Not Implemented |
MI0315 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $9,833 | $434 | Implemented |
MI0315 # 07 Y:2017 | 07 | 2017 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,476 | $6,800 | Implemented |
MI0315 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,093 | $5,340 | Implemented |
UU0118 # 01 Y:2017 | 01 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $13,592 | $500 | Not Implemented |
UU0118 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM TEMPERATURE | $7,381 | $0 | Implemented |
UU0118 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,762 | $0 | Not Implemented |
UU0118 # 04 Y:2017 | 04 | 2017 | INSTALL SPECTRAL REFLECTORS / DELAMP | $361 | $113 | Not Implemented |
MZ0230 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,978 | $27,450 | Implemented |
MZ0230 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,308 | $0 | Implemented |
MZ0230 # 03 Y:2017 | 03 | 2017 | MINIMIZE WATER USAGE | $199 | $30 | Implemented |