Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
324
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0300 # 03 Y:1997 | 03 | 1997 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $5,148 | $17,000 | Not Implemented |
WI0300 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,810 | $90 | Implemented |
WI0300 # 05 Y:1997 | 05 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $606 | $640 | Not Implemented |
WI0300 # 06 Y:1997 | 06 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,192 | $0 | Implemented |
WI0300 # 07 Y:1997 | 07 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $1,932 | $400 | Not Implemented |
WI0300 # 08 Y:1997 | 08 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,355 | $500 | Not Implemented |
WI0300 # 09 Y:1997 | 09 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,241 | $2,739 | Not Implemented |
WI0300 # 10 Y:1997 | 10 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,112 | $5,000 | Not Implemented |
WI0300 # 11 Y:1997 | 11 | 1997 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $585 | $0 | Implemented |
BD0088 # 01 Y:1997 | 01 | 1997 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $19,848 | $18,325 | Not Implemented |
BD0088 # 02 Y:1997 | 02 | 1997 | INSTALL OCCUPANCY SENSORS | $3,946 | $1,275 | Not Implemented |
BD0088 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,452 | $500 | Not Implemented |
BD0088 # 04 Y:1997 | 04 | 1997 | INSULATE BARE EQUIPMENT | $1,892 | $3,999 | Not Implemented |
BD0088 # 05 Y:1997 | 05 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,299 | $2,750 | Not Implemented |
BD0088 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,229 | $2,249 | Not Implemented |
BD0088 # 07 Y:1997 | 07 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $24,305 | $1,900 | Not Implemented |
BD0088 # 08 Y:1997 | 08 | 1997 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $551 | $290 | Not Implemented |
BD0088 # 09 Y:1997 | 09 | 1997 | $4,211 | $0 | Not Implemented | |
WI0299 # 01 Y:1997 | 01 | 1997 | $36,166 | $7,000 | Not Implemented | |
WI0299 # 02 Y:1997 | 02 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,337 | $0 | Not Implemented |
WI0299 # 03 Y:1997 | 03 | 1997 | DIRECT WASTE GASSES TO BOILER COMBUSTION AIR | $16,400 | $10,000 | Implemented |
WI0299 # 04 Y:1997 | 04 | 1997 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $15,359 | $10,000 | Not Implemented |
WI0299 # 05 Y:1997 | 05 | 1997 | $8,748 | $12,000 | Implemented | |
WI0299 # 06 Y:1997 | 06 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,439 | $16,400 | Not Implemented |
WI0299 # 07 Y:1997 | 07 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,424 | $500 | Implemented |