IAC logo
IAC Assessment: BD0088
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0088
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1997
Principal Product Aerosol Cans
NAICS n/a
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 56
Plant Area (Sq.Ft.) 120,000
Annual Production 98,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,436 3,286,929 kWh $0.04
Electricity Demand $71,568 7,558 kW-months/year $9.47
Electricity Fees $11,382 - $ -
Natural Gas $50,090 14,192 MMBtu $3.53
TOTAL ENERGY COSTS $273,056
RECOMMENDED SAVINGS* $60,733 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$19,848
Cost:
$18,325
- - - - $19,848 5,623 - - - - - - - - -
-
kWh
-
-
kW-months/year
$19,848
5,623
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,946
Cost:
$1,275
$2,550 65,651 $1,396 147 - - - - - - - - - - $2,550
65,651
kWh
$1,396
147
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,452
Cost:
$500
$2,510 64,771 $942 100 - - - - - - - - - - $2,510
64,771
kWh
$942
100
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,892
Cost:
$3,999
- - - - $1,892 536 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,892
536
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,299
Cost:
$2,750
$961 24,912 $338 36 - - - - - - - - - - $961
24,912
kWh
$338
36
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,229
Cost:
$2,249
$705 18,171 $524 55 - - - - - - - - - - $705
18,171
kWh
$524
55
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$24,305
Cost:
$1,900
- - - - - - - - $(-10,920) - $(-2,882) - $38,107 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-10,920)
-
$
$(-2,882)
-
$
$38,107
-
$
08: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$551
Cost:
$290
- - - - - - $551 10,530 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$551
10,530
lb
-
-
$
-
-
$
-
-
$
09: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$4,211
Cost:
-
- - - - - - - - - - - - $4,211 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$4,211
-
$
TOTAL RECOMMENDED Savings:
$60,733
Cost:
$31,288
$6,726 173,505 $3,200 338 $21,740 6,159 $551 10,530 $(-10,920) - $(-2,882) - $42,318 - $6,726
173,505
kWh
$3,200
338
kW-months/year
$21,740
6,159
MMBtu
$551
10,530
lb
$(-10,920)
-
$
$(-2,882)
-
$
$42,318
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product