Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
318
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0590 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $560 | $500 | Implemented |
CO0590 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,940 | $70,090 | Not Implemented |
CO0590 # 09 Y:2006 | 09 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,850 | $32,600 | Not Implemented |
CO0590 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $1,280 | $680 | Implemented |
CO0590 # 11 Y:2006 | 11 | 2006 | INSTALL OCCUPANCY SENSORS | $210 | $780 | Not Implemented |
CO0590 # 12 Y:2006 | 12 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $160 | $500 | Implemented |
CO0589 # 01 Y:2006 | 01 | 2006 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $264,540 | $1,173,000 | Not Implemented |
CO0589 # 02 Y:2006 | 02 | 2006 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $56,580 | $570 | Implemented |
CO0589 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $950 | $500 | Implemented |
CO0589 # 04 Y:2006 | 04 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $23,960 | $0 | Implemented |
CO0589 # 05 Y:2006 | 05 | 2006 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $21,540 | $100,800 | Not Implemented |
CO0589 # 06 Y:2006 | 06 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,910 | $32,600 | Not Implemented |
CO0574 # 01 Y:2005 | 01 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $37,120 | $6,000 | Not Implemented |
CO0574 # 02 Y:2005 | 02 | 2005 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,700 | $2,350 | Not Implemented |
CO0574 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,160 | $210 | Implemented |
CO0574 # 04 Y:2005 | 04 | 2005 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $1,170 | $1,150 | Not Implemented |
CO0574 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $162 | $118 | Implemented |
CO0574 # 06 Y:2005 | 06 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $450 | $110 | Not Implemented |
CO0574 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,000 | $41,750 | Not Implemented |
CO0574 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,410 | $1,420 | Not Implemented |
CO0574 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,350 | $12,520 | Not Implemented |
CO0574 # 10 Y:2005 | 10 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,830 | $6,160 | Not Implemented |
CO0574 # 11 Y:2005 | 11 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $840 | $6,120 | Not Implemented |
CO0573 # 01 Y:2005 | 01 | 2005 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $99,230 | $295,000 | Not Implemented |
CO0573 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,040 | $1,030 | Implemented |