Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

318

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0590 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $560 $500 Implemented
CO0590 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,940 $70,090 Not Implemented
CO0590 # 09 Y:2006 09 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $3,850 $32,600 Not Implemented
CO0590 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $1,280 $680 Implemented
CO0590 # 11 Y:2006 11 2006 INSTALL OCCUPANCY SENSORS $210 $780 Not Implemented
CO0590 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $500 Implemented
CO0589 # 01 Y:2006 01 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $264,540 $1,173,000 Not Implemented
CO0589 # 02 Y:2006 02 2006 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $56,580 $570 Implemented
CO0589 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $950 $500 Implemented
CO0589 # 04 Y:2006 04 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $23,960 $0 Implemented
CO0589 # 05 Y:2006 05 2006 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $21,540 $100,800 Not Implemented
CO0589 # 06 Y:2006 06 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $3,910 $32,600 Not Implemented
CO0574 # 01 Y:2005 01 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $37,120 $6,000 Not Implemented
CO0574 # 02 Y:2005 02 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,700 $2,350 Not Implemented
CO0574 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,160 $210 Implemented
CO0574 # 04 Y:2005 04 2005 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $1,170 $1,150 Not Implemented
CO0574 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $162 $118 Implemented
CO0574 # 06 Y:2005 06 2005 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $450 $110 Not Implemented
CO0574 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,000 $41,750 Not Implemented
CO0574 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,410 $1,420 Not Implemented
CO0574 # 09 Y:2005 09 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,350 $12,520 Not Implemented
CO0574 # 10 Y:2005 10 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,830 $6,160 Not Implemented
CO0574 # 11 Y:2005 11 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $840 $6,120 Not Implemented
CO0573 # 01 Y:2005 01 2005 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $99,230 $295,000 Not Implemented
CO0573 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,040 $1,030 Implemented