IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,801

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0586 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,427 $35,960 n/a
LE0586 # 05 Y:2025 05 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,340 $49,500 n/a
LE0585 # 01 Y:2025 01 2025 INSTALL TIMERS AND/OR THERMOSTATS $27,784 $0 n/a
LE0585 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,317 $2,200 n/a
LE0585 # 03 Y:2025 03 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,395 $660 n/a
LE0585 # 04 Y:2025 04 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,641 $25,639 n/a
LE0585 # 05 Y:2025 05 2025 USE SOLAR HEAT TO HEAT WATER $132,239 $658,000 n/a
LE0584 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,871 $0 n/a
LE0584 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,030 $100 n/a
LE0584 # 03 Y:2025 03 2025 INSTALL TIMERS AND/OR THERMOSTATS $1,504 $600 n/a
LE0584 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,377 $2,400 n/a
LE0584 # 05 Y:2025 05 2025 INSTALL BACK-UP EQUIPMENT $148,846 $350,000 n/a
LE0584 # 06 Y:2025 06 2025 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,853 $5,000 n/a
LE0584 # 07 Y:2025 07 2025 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,000 $31,500 n/a
LE0584 # 08 Y:2025 08 2025 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,045 $30,000 n/a
WV0671 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,904 $15,193 Implemented
WV0671 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $16,714 $10,679 Implemented
WV0671 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,594 $38,917 Not Implemented
WV0671 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,306 $17,145 Implemented
WV0671 # 05 Y:2024 05 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,906 $5,200 Implemented
WV0671 # 06 Y:2024 06 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,058 $5,330 Implemented
WV0671 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $3,901 $6,364 Implemented
WV0671 # 08 Y:2024 08 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,623 $1,200 Implemented
WV0671 # 09 Y:2024 09 2024 DEVELOP A REPAIR/REPLACE POLICY $3,020 $1,180 Implemented
WV0671 # 10 Y:2024 10 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,918 $2,094 Not Implemented