IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0654 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $44,735 $130,000 Not Implemented
CL2014 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,784 $23,313 Implemented
CL2014 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $10,901 $2,295 Implemented
CL2014 # 03 Y:2020 03 2020 REPLACE TREATED WATER WITH WELL / SURFACE WATER $922 $862 Not Implemented
CL2013 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,650 $33,470 Implemented
CL2013 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,416 $4,336 Implemented
CL2013 # 03 Y:2020 03 2020 ISOLATE HOT OR COLD EQUIPMENT $1,527 $461 Implemented
CL2013 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,311 $0 Implemented
CL2012 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,598 $22,698 Not Implemented
CL2012 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $81,451 $690,939 Not Implemented
CL2012 # 03 Y:2020 03 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $16,920 $0 Not Implemented
CL2012 # 04 Y:2020 04 2020 PAY UTILITY BILLS ON TIME $770 $0 Not Implemented
CL2011 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,964 $3,933 Implemented
CL2011 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $1,997 $295 Implemented
CL2011 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $587 $0 Implemented
CL2011 # 04 Y:2020 04 2020 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $7,830 $4,500 Implemented
CL2011 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,975 $400 Implemented
CL2010 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,534 $13,514 Implemented
CL2010 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $1,084 $656 Implemented
CL2010 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $114,467 $157,000 Implemented
CL2010 # 04 Y:2020 04 2020 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $14,466 $4,500 Implemented
CL2009 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,388 $1,300 Implemented
CL2009 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,350 $1,650 Implemented
CL2009 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,213 $0 Not Implemented
CL2009 # 04 Y:2020 04 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $9,407 $23,157 Implemented