IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0207 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,709 $120 Implemented
UL0207 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $20 Implemented
UL0207 # 03 Y:1998 03 1998 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $74,500 $163,800 Not Implemented
UL0207 # 04 Y:1998 04 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $6,000 $1,320 Not Implemented
UL0207 # 05 Y:1998 05 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $306,800 $117,500 Implemented
SF0155 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,426 $0 Not Implemented
SF0155 # 02 Y:1998 02 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $17,964 $17,964 Not Implemented
SF0155 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,497 $1,932 Not Implemented
SF0155 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $3,544 $2,912 Not Implemented
SF0155 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,748 $3,316 Not Implemented
SF0155 # 06 Y:1998 06 1998 USE PHOTOCELL CONTROLS $4,531 $6,000 Not Implemented
SF0155 # 07 Y:1998 07 1998 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,467 $8,500 Not Implemented
SF0155 # 08 Y:1998 08 1998 OPTIMIZE PLANT POWER FACTOR $4,625 $8,548 Not Implemented
SF0155 # 09 Y:1998 09 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $75,844 $200,000 Not Implemented
SF0155 # 10 Y:1998 10 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,609 $52,880 Not Implemented
SF0155 # 11 Y:1998 11 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $13,390 $0 Not Implemented
SF0155 # 12 Y:1998 12 1998 RECOVER AND REUSE WASTE MATERIAL $18,170 $0 Not Implemented
SF0155 # 13 Y:1998 13 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,200 $120 Not Implemented
SF0155 # 14 Y:1998 14 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,520 $120 Not Implemented
SF0155 # 15 Y:1998 15 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,728 $120,000 Not Implemented
SF0155 # 16 Y:1998 16 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $408,564 $500,000 Not Implemented
SF0155 # 17 Y:1998 17 1998 ADOPT IN-HOUSE MATERIAL GENERATION $75,299 $142,000 Not Implemented
SF0155 # 18 Y:1998 18 1998 INSTALL SENSORS TO DETECT DEFECTS $50,000 $240,200 Not Implemented
SF0155 # 19 Y:1998 19 1998 INSTALL SENSORS TO DETECT DEFECTS $3,000 $21,270 Not Implemented
CO0429 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $840 $1,000 Implemented