Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0337 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,605 | $180 | Implemented |
AS0337 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,017 | $11 | Implemented |
AS0337 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $543 | $1,875 | Not Implemented |
AS0337 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $209 | $164 | Implemented |
AS0337 # 05 Y:2002 | 05 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,723 | $16,500 | Implemented |
AS0337 # 06 Y:2002 | 06 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,736 | $4,622 | Implemented |
AS0337 # 07 Y:2002 | 07 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,565 | $60 | Implemented |
AS0337 # 08 Y:2002 | 08 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,034 | $5,800 | Not Implemented |
AS0337 # 09 Y:2002 | 09 | 2002 | BURN WASTE OIL FOR HEAT | $5,757 | $9,000 | Not Implemented |
AS0337 # 10 Y:2002 | 10 | 2002 | RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE | $5,640 | $60 | Not Implemented |
TA0044 # 01 Y:2002 | 01 | 2002 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $114,400 | $0 | Implemented |
TA0044 # 02 Y:2002 | 02 | 2002 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $23,976 | $65,000 | Not Implemented |
TA0044 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $19,880 | $2,455 | Implemented |
TA0044 # 04 Y:2002 | 04 | 2002 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,715 | $72 | Implemented |
TA0044 # 05 Y:2002 | 05 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,725 | $450 | Implemented |
TA0044 # 06 Y:2002 | 06 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $6,650 | $270 | Implemented |
TA0044 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,596 | $144 | Implemented |
TA0044 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,807 | $11,685 | Implemented |
TA0044 # 09 Y:2002 | 09 | 2002 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $3,200 | $0 | Implemented |
TA0044 # 10 Y:2002 | 10 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $225 | $180 | Implemented |
OK0646 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,976 | $3,150 | Not Implemented |
OK0646 # 02 Y:2002 | 02 | 2002 | INSTALL SET-BACK TIMERS | $469 | $93 | Implemented |
OK0646 # 03 Y:2002 | 03 | 2002 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $659 | $0 | Implemented |
OK0646 # 04 Y:2002 | 04 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $13,960 | $0 | Implemented |
OK0646 # 05 Y:2002 | 05 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $113 | $60 | Not Implemented |