Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
101,599
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0753 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $4,874 | $9,950 | Not Implemented |
OK0753 # 05 Y:2007 | 05 | 2007 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $387,006 | $553,000 | Not Implemented |
OK0753 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,715 | $4,795 | Not Implemented |
OK0753 # 07 Y:2007 | 07 | 2007 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,437 | $13,500 | Not Implemented |
OK0753 # 08 Y:2007 | 08 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000 | $0 | Not Implemented |
OK0753 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,439 | $4,489 | Not Implemented |
OR0526 # 01 Y:2007 | 01 | 2007 | INSTALL SENSORS TO DETECT DEFECTS | $371,000 | $1,113,000 | Not Implemented |
OR0526 # 02 Y:2007 | 02 | 2007 | MODIFY WORKLOAD | $162,000 | $23,000 | Not Implemented |
OR0526 # 03 Y:2007 | 03 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $70,000 | $48,000 | Not Implemented |
OR0526 # 04 Y:2007 | 04 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,200 | $30,000 | Implemented |
OR0526 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,600 | $2,600 | Implemented |
OR0526 # 06 Y:2007 | 06 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $8,800 | $800 | Not Implemented |
OR0526 # 07 Y:2007 | 07 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,400 | $3,800 | Implemented |
DL0009 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $28,059 | $10,000 | Implemented |
DL0009 # 02 Y:2007 | 02 | 2007 | REDESIGN PROCESS | $15,567 | $6,300 | Not Implemented |
DL0009 # 03 Y:2007 | 03 | 2007 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $11,200 | $60,000 | Not Implemented |
DL0009 # 04 Y:2007 | 04 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,793 | $11,313 | Not Implemented |
DL0009 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,192 | $50,000 | Implemented |
DL0009 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,454 | $0 | Not Implemented |
DL0009 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,890 | $695 | Implemented |
DL0009 # 08 Y:2007 | 08 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,941 | $590 | Not Implemented |
DL0009 # 09 Y:2007 | 09 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,924 | $3,809 | Implemented |
DL0009 # 10 Y:2007 | 10 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,500 | $4,968 | Not Implemented |
DL0009 # 11 Y:2007 | 11 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,550 | $20,000 | Implemented |
DL0009 # 12 Y:2007 | 12 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $160 | Not Implemented |