Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0186 # 01 Y:2009 | 01 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $160,282 | $0 | Implemented |
MI0186 # 02 Y:2009 | 02 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $110,625 | $4,000 | Implemented |
MI0186 # 03 Y:2009 | 03 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $76,266 | $28,000 | Not Implemented |
MI0186 # 04 Y:2009 | 04 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $56,948 | $10,000 | Implemented |
MI0186 # 05 Y:2009 | 05 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $24,293 | $1,600 | Not Implemented |
MI0186 # 06 Y:2009 | 06 | 2009 | DISCONNECT BALLASTS | $3,090 | $900 | Not Implemented |
SD0421 # 01 Y:2009 | 01 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,500 | $6,463 | Not Implemented |
SD0421 # 02 Y:2009 | 02 | 2009 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $35,684 | $50,000 | Implemented |
SD0421 # 03 Y:2009 | 03 | 2009 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $94,850 | $12,450 | Not Implemented |
SD0421 # 04 Y:2009 | 04 | 2009 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $269,651 | $1,430,000 | Not Implemented |
SD0421 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,149 | $2,700 | Implemented |
SD0421 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,991 | $16,630 | Not Implemented |
SD0421 # 07 Y:2009 | 07 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $60,774 | $175,800 | Not Implemented |
SD0421 # 08 Y:2009 | 08 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $568 | $1,444 | Implemented |
MI0185 # 01 Y:2009 | 01 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $123,100 | $64,000 | Not Implemented |
MI0185 # 02 Y:2009 | 02 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $83,014 | $1,500 | Implemented |
MI0185 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,375 | $60 | Implemented |
MI0185 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,482 | $920 | Implemented |
MI0185 # 05 Y:2009 | 05 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $12,330 | $800 | Implemented |
MI0185 # 06 Y:2009 | 06 | 2009 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,182 | $640 | Implemented |
LL0322 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,918 | $4,600 | Implemented |
LL0322 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $30 | Implemented |
LL0322 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,523 | $910 | Not Implemented |
LL0322 # 04 Y:2009 | 04 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $967 | $120 | Not Implemented |
LL0322 # 05 Y:2009 | 05 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $676 | $1,155 | Not Implemented |