IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0093 # 11 Y:2017 11 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,813 $11,115 Not Implemented
IP0093 # 12 Y:2017 12 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $894 $2,116 Not Implemented
IP0092 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,211 $0 Implemented
IP0092 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $876 $0 Implemented
IP0092 # 03 Y:2017 03 2017 PAY BILLS ON TIME TO AVOID LATE FEES $7,288 $0 Implemented
IP0092 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $546 $31 Implemented
IP0092 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $635 $42 Implemented
IP0092 # 06 Y:2017 06 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,898 $1,119 Implemented
IP0092 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112,756 $41,810 Implemented
GT0908 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,412 $125 Implemented
GT0908 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,577 $578 Implemented
GT0908 # 03 Y:2017 03 2017 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $25,748 $19,769 Not Implemented
GT0908 # 04 Y:2017 04 2017 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $30,382 $47,492 Not Implemented
GT0908 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,538 $61,313 Implemented
GT0908 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $44,491 $135,000 Implemented
LS0013 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,009 $200 Not Implemented
LS0013 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $8,468 $4,570 Not Implemented
LS0013 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $2,200 Not Implemented
LS0013 # 04 Y:2017 04 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $135 $290 Not Implemented
LS0013 # 05 Y:2017 05 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $313 $1,105 Not Implemented
MI0325 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,225 $14,854 Not Implemented
MI0325 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,604 $1,660 Implemented
MI0325 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,332 $4,841 Not Implemented
MI0325 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,058 $9,700 Not Implemented
MI0325 # 05 Y:2017 05 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,801 $160 Implemented