IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0573 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,784 $5,838 Implemented
SD0573 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,330 $10,000 Implemented
SD0573 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,699 $900 Implemented
SD0573 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $1,115 $2,775 Implemented
SD0573 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $64 $63 Implemented
SF0528 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,402 $11,547 Not Implemented
SF0528 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,330 $22,874 Implemented
SF0528 # 03 Y:2018 03 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,178 $27,403 Not Implemented
SD0572 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $75,389 $234,915 Implemented
SD0572 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,304 $22,430 Implemented
SD0572 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,372 $0 Implemented
SD0572 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $970 $1,350 Implemented
SD0572 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $349 $378 Implemented
SD0571 # 01 Y:2018 01 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $35,866 $178,055 Not Implemented
SD0571 # 02 Y:2018 02 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $20,104 $28,000 Not Implemented
SD0571 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $3,128 $939 Not Implemented
SD0571 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,822 $2,000 Not Implemented
SD0571 # 05 Y:2018 05 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $781 $3,825 Not Implemented
SF0527 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,577 $0 Implemented
SF0527 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $545 $70 Implemented
SF0527 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,584 $27,496 Implemented
SF0527 # 04 Y:2018 04 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $76,906 $341,292 Not Implemented
SF0526 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,234 $70 Not Implemented
SF0526 # 02 Y:2018 02 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,043 $1,093 Implemented
SF0526 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $2,520 $1,157 Implemented