IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0643 # 07 Y:2002 07 2002 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,989 $11,500 n/a
UD0643 # 08 Y:2002 08 2002 INSTALL TIMERS AND/OR THERMOSTATS $4,481 $1,000 Not Implemented
UD0643 # 09 Y:2002 09 2002 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,882 $1,000 Not Implemented
UD0643 # 10 Y:2002 10 2002 USE PHOTOCELL CONTROLS $1,370 $825 Not Implemented
UD0643 # 11 Y:2002 11 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $254 $300 Not Implemented
UM0201 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $972,000 $3,390,000 n/a
UM0201 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $493,600 $1,060,000 n/a
UM0201 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $519,147 $1,100,000 Not Implemented
UM0201 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $76,800 $348,000 Not Implemented
UL0249 # 01 Y:2000 01 2000 INSTALL SKYLIGHTS $4,840 $5,700 Implemented
UL0249 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,210 $0 Implemented
UL0249 # 03 Y:2000 03 2000 MINIMIZE WATER USAGE $3,539 $909 Not Implemented
UL0249 # 04 Y:2000 04 2000 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $1,537 $700 Not Implemented
UL0249 # 05 Y:2000 05 2000 COMBINE UTILITY METERS $3,900 $5,000 Implemented
UL0248 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,938 $15,352 Implemented
UL0248 # 02 Y:2000 02 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $51,600 $6,600 Implemented
UL0248 # 03 Y:2000 03 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $28,000 $3,318 Not Implemented
UL0246 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,062 $20 Not Implemented
UL0246 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $220 $44 Not Implemented
UL0246 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,128 $20,707 Not Implemented
UL0246 # 04 Y:2000 04 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $121 $0 Not Implemented
UL0246 # 05 Y:2000 05 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $23,625 $2,500 Not Implemented
TN0690 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $272,160 $169,485 Not Implemented
TN0690 # 02 Y:2000 02 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $164,990 $183,505 Implemented
TN0690 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $93,903 $3,930 Implemented