IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,036

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0462 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,158 $15,702 Not Implemented
IA0462 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,704 $16,590 Not Implemented
IA0462 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,818 $1,530 Not Implemented
IA0462 # 04 Y:2011 04 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,656 $20,000 Not Implemented
IA0462 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $15,983 $25,000 Not Implemented
IA0462 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,698 $240 Not Implemented
IA0462 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,593 $250 Not Implemented
IA0462 # 08 Y:2011 08 2011 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $22,774 $1,500 Not Implemented
IA0462 # 09 Y:2011 09 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,450 $1,000 Not Implemented
IA0462 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,518 $200 Not Implemented
IC0176 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $317 $1,315 Not Implemented
IC0176 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $441 Not Implemented
IC0176 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,067 $1,035 Implemented
IC0176 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $880 $519 Not Implemented
IC0176 # 05 Y:2010 05 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $858 $0 Not Implemented
IC0176 # 06 Y:2010 06 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,358 $5,900 Not Implemented
IC0176 # 07 Y:2010 07 2010 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,677 $40,071 Implemented
IC0176 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $205 $0 Implemented
IC0166 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,511 $10,994 Implemented
IC0166 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,135 $4,045 Not Implemented
IC0166 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $136 Not Implemented
IC0166 # 04 Y:2009 04 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,442 $1,720 Not Implemented
IC0166 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $84 $345 Implemented
IC0166 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $134 $0 Implemented
IC0166 # 07 Y:2009 07 2009 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $3,264 $16,200 Not Implemented