IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0249 # 08 Y:1992 08 1992 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $742 $1,668 Implemented
MA0249 # 09 Y:1992 09 1992 IMPROVE LUBRICATION PRACTICES $750 $0 Not Implemented
MA0249 # 10 Y:1992 10 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $512 $77 Not Implemented
MA0250 # 01 Y:1992 01 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $157,407 $100,000 Not Implemented
MA0250 # 02 Y:1992 02 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $39,404 $1,280 Implemented
MA0250 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,414 $25,738 Not Implemented
MA0250 # 04 Y:1992 04 1992 COVER OPEN TANKS $10,241 $2,000 Not Implemented
MA0250 # 05 Y:1992 05 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,289 $0 Implemented
AM0157 # 01 Y:1992 01 1992 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $67,280 $2,250 Implemented
AM0157 # 02 Y:1992 02 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $37,400 $53,200 Implemented
AM0157 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $32,285 $96,000 Implemented
AM0157 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,410 $0 Implemented
AM0157 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,180 $630 Implemented
AM0157 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,470 $4,080 Implemented
AM0157 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $960 $0 Implemented
AM0158 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,797 $7,379 Implemented
AM0158 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $29,200 $19,590 Not Implemented
AM0158 # 03 Y:1992 03 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,300 $21,640 Not Implemented
AM0158 # 04 Y:1992 04 1992 OPTIMIZE PLANT POWER FACTOR $11,800 $32,000 Not Implemented
AM0158 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,200 $960 Implemented
AM0158 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $4,370 $4,050 Not Implemented
AM0158 # 07 Y:1992 07 1992 REPAIR AND ELIMINATE STEAM LEAKS $3,780 $870 Implemented
AM0158 # 08 Y:1992 08 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,190 $1,150 Implemented
AM0158 # 09 Y:1992 09 1992 INSULATE BARE EQUIPMENT $1,760 $5,950 Not Implemented
AM0158 # 10 Y:1992 10 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,600 $170 Implemented