IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0004 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $184 $150 Implemented
MZ0004 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,950 $24,700 Not Implemented
MZ0004 # 06 Y:2007 06 2007 DISCONNECT BALLASTS $19,720 $1,050 Not Implemented
MZ0004 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $6,900 $2,950 Not Implemented
MZ0004 # 08 Y:2007 08 2007 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $56,125 $0 Not Implemented
MZ0004 # 09 Y:2007 09 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,600 $0 Implemented
UW0001 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,324 $10,082 Implemented
UW0001 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $7,373 $12,013 Not Implemented
UW0001 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,451 $13,219 Not Implemented
UW0001 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,215 $1,385 Not Implemented
UW0001 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,052 $1,291 Not Implemented
UW0001 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $880 $1,900 Not Implemented
UW0001 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $682 $553 Not Implemented
CO0601 # 01 Y:2007 01 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $13,760 $90,000 Not Implemented
CO0601 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,870 $48,000 Not Implemented
CO0601 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,760 $500 Implemented
CO0601 # 04 Y:2007 04 2007 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,240 $230 Not Implemented
CO0601 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $201 $277 Implemented
CO0601 # 06 Y:2007 06 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,460 $11,000 Not Implemented
BD0327 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,018 $1,000 Not Implemented
BD0327 # 02 Y:2007 02 2007 USE SYNTHETIC LUBRICANT $4,257 $600 Not Implemented
BD0327 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,520 $600 Not Implemented
BD0327 # 04 Y:2007 04 2007 INSTALL REPLACEMENT DOORS $7,558 $20,000 Not Implemented
BD0327 # 05 Y:2007 05 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $15,124 $6,800 Not Implemented
BD0327 # 06 Y:2007 06 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,271 $500 Not Implemented