Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0296 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $540 | $793 | Not Implemented |
SU0296 # 06 Y:2010 | 06 | 2010 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $79,942 | $129,646 | Implemented |
SU0296 # 07 Y:2010 | 07 | 2010 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $71,218 | $132,133 | Not Implemented |
SU0296 # 08 Y:2010 | 08 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $373 | $732 | Not Implemented |
SU0296 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,680 | $5,928 | Not Implemented |
SU0296 # 10 Y:2010 | 10 | 2010 | OPTIMIZE PLANT POWER FACTOR | $1,823 | $8,254 | Not Implemented |
GT0873 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,353 | $0 | Implemented |
GT0873 # 02 Y:2010 | 02 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,144 | $4,600 | Not Implemented |
GT0873 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,825 | $19,768 | Not Implemented |
GT0873 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $3,777 | $10,640 | Implemented |
GT0873 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $816 | $4,400 | Implemented |
GT0873 # 06 Y:2010 | 06 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $11,661 | $775 | Implemented |
MI0189 # 01 Y:2010 | 01 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,179 | $5,366 | Not Implemented |
MI0189 # 02 Y:2010 | 02 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,451 | $2,000 | Implemented |
MI0189 # 03 Y:2010 | 03 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,033 | $10,500 | Implemented |
MI0189 # 04 Y:2010 | 04 | 2010 | INSTALL SKYLIGHTS | $4,317 | $2,400 | Not Implemented |
MI0189 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,161 | $7,164 | Implemented |
MI0189 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,029 | $1,210 | Implemented |
UA0053 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,526 | $53,770 | Not Implemented |
UA0053 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,266 | $13,725 | Not Implemented |
UA0053 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $2,400 | $1,080 | Not Implemented |
UA0053 # 04 Y:2010 | 04 | 2010 | USE PHOTOCELL CONTROLS | $218 | $177 | Implemented |
UA0053 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $351 | $906 | Implemented |
UA0053 # 06 Y:2010 | 06 | 2010 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,505 | $1,000 | Implemented |
UA0053 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,870 | $26,550 | Not Implemented |