IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0801 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,150 $420 Not Implemented
AM0801 # 06 Y:2020 06 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $580 $300 Implemented
AM0802 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $33,740 $4,500 Implemented
AM0802 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,090 $13,250 Implemented
AM0802 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,146 $1,950 Implemented
AM0802 # 04 Y:2020 04 2020 PAY UTILITY BILLS ON TIME $1,850 $0 Implemented
AM0802 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,512 $2,280 Implemented
AM0802 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,175 $1,200 Implemented
AM0802 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $540 $25 Not Implemented
BS0136 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,513 $4,844 Not Implemented
BS0136 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $2,100 $3,760 Not Implemented
BS0136 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $25,951 $77,377 Not Implemented
BS0136 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,213 $4,620 Not Implemented
BS0136 # 05 Y:2020 05 2020 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $2,938 $4,056 Not Implemented
BS0136 # 06 Y:2020 06 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,864 $1,500 Not Implemented
BS0136 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,209 $610 Not Implemented
BS0136 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $325 $675 Not Implemented
BS0136 # 09 Y:2020 09 2020 USE SOLAR HEAT FOR HEAT $9,114 $35,799 Not Implemented
UD1015 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,207 $0 Implemented
UD1015 # 02 Y:2020 02 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,248 $309 Not Implemented
UD1015 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,267 $0 Implemented
UD1015 # 04 Y:2020 04 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $769 $1,080 Not Implemented
UD1015 # 05 Y:2020 05 2020 USE MULTIPLE-EFFECT EVAPORATORS $18,945 $26,742 Not Implemented
UD1015 # 06 Y:2020 06 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,958 $0 Not Implemented
UD1015 # 07 Y:2020 07 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $6,591 $0 Implemented