IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0526 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,205 $16,016 Implemented
SF0526 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,669 $5,876 Implemented
SF0526 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $8,414 $20,536 Implemented
SF0526 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,959 $22,846 Not Implemented
SD0570 # 01 Y:2018 01 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $9,960 $48,827 Not Implemented
SD0570 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,773 $20,484 Not Implemented
SD0570 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,329 $4,062 Not Implemented
SD0570 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,416 $2,000 Not Implemented
SD0570 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $1,089 $2,220 Not Implemented
SD0570 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $562 $200 Not Implemented
SD0570 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $322 $406 Not Implemented
SF0525 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $49,766 $0 Implemented
SF0525 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,260 $0 Implemented
SF0525 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,078 $160 Implemented
SF0525 # 04 Y:2018 04 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,086 $354 Not Implemented
SF0525 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,368 $59,620 Implemented
SF0525 # 06 Y:2018 06 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $124,618 $491,526 Not Implemented
SD0569 # 01 Y:2018 01 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $53,280 $265,840 Not Implemented
SD0569 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,921 $2,000 Implemented
SD0569 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,832 $13,363 Implemented
SD0569 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,555 $6,800 Not Implemented
SD0569 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $2,839 $11,100 Implemented
SD0568 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $2,000 Implemented
SD0568 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,096 $0 Implemented
SD0568 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $742 $3,292 Implemented