Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0948 # 07 Y:2016 | 07 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $38,094 | $0 | Implemented |
UD0948 # 08 Y:2016 | 08 | 2016 | OPTIMIZE PLANT POWER FACTOR | $11,880 | $60,000 | Not Implemented |
UD0948 # 09 Y:2016 | 09 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $105,009 | $700 | Not Implemented |
UD0948 # 10 Y:2016 | 10 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,006 | $5,000 | Not Implemented |
UD0948 # 11 Y:2016 | 11 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,945 | $360,069 | Implemented |
UD0948 # 12 Y:2016 | 12 | 2016 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $195,456 | $17,000 | Not Implemented |
UD0947 # 01 Y:2016 | 01 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $10,920 | $1,000 | Implemented |
UD0947 # 02 Y:2016 | 02 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $6,835 | $0 | Implemented |
UD0947 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $953 | $2,000 | Not Implemented |
UD0947 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $618 | $200 | Not Implemented |
UD0947 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $1,000 | Not Implemented |
UD0947 # 06 Y:2016 | 06 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $893 | $680 | Not Implemented |
UD0947 # 07 Y:2016 | 07 | 2016 | IMPROVE COMBUSTION CONTROL CAPABILITY | $577 | $0 | Implemented |
UD0947 # 08 Y:2016 | 08 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,128 | $1,593 | Not Implemented |
UD0947 # 09 Y:2016 | 09 | 2016 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,493 | $400 | Implemented |
UD0947 # 10 Y:2016 | 10 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $495 | $50 | Implemented |
UD0947 # 11 Y:2016 | 11 | 2016 | REDUCE VENTILATION AIR | $1,405 | $9,120 | Not Implemented |
UD0947 # 12 Y:2016 | 12 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $8,339 | $23,265 | Not Implemented |
UD0947 # 13 Y:2016 | 13 | 2016 | OPTIMIZE PLANT POWER FACTOR | $994 | $2,000 | Not Implemented |
UD0947 # 14 Y:2016 | 14 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,211 | $81,318 | Not Implemented |
UD0947 # 15 Y:2016 | 15 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,498 | $20,246 | Not Implemented |
UD0947 # 16 Y:2016 | 16 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,398 | $51,121 | Not Implemented |
UD0947 # 17 Y:2016 | 17 | 2016 | DISCONNECT BALLASTS | $694 | $345 | Not Implemented |
UM0467 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $1,731 | $1,080 | n/a |
UM0467 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $257 | $1,170 | n/a |