IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0082 # 04 Y:1997 04 1997 BURN WASTE OIL FOR HEAT $3,300 $5,320 Not Implemented
OD0082 # 05 Y:1997 05 1997 CLEAR AND RENT EXISTING SPACE $50,000 $1,600 Not Implemented
OD0083 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,624 $1,487 n/a
OD0083 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,747 $5,202 n/a
OD0083 # 03 Y:1997 03 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,031 $2,091 n/a
OD0083 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $12,028 $5,691 n/a
OD0083 # 05 Y:1997 05 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $500,032 $30,482 n/a
OD0080 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $85 $247 Not Implemented
OD0080 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,090 $150 Implemented
OD0080 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $758 $320 Implemented
OD0080 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $65 $0 Implemented
OD0080 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $563 $210 Implemented
OD0080 # 06 Y:1997 06 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,392 $0 Not Implemented
TN0606 # 01 Y:1997 01 1997 REVISE RAW MATERIAL SPECS $134,780 $10,600 Implemented
TN0606 # 02 Y:1997 02 1997 BURN A LESS EXPENSIVE GRADE OF FUEL $19,980 $8,480 Implemented
TN0606 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,900 $3,800 Implemented
TN0606 # 04 Y:1997 04 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,800 $0 Implemented
TN0606 # 05 Y:1997 05 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,600 $0 Implemented
TN0606 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,320 $2,800 Not Implemented
TN0606 # 07 Y:1997 07 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,000 $375 Not Implemented
TN0606 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $400 Not Implemented
OD0081 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,491 $5,176 n/a
OD0081 # 02 Y:1997 02 1997 SHUT OFF PILOTS IN STANDBY EQUIPMENT $222 $0 n/a
OD0081 # 03 Y:1997 03 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $485 $0 n/a
OD0081 # 04 Y:1997 04 1997 ELIMINATE A BY-PRODUCT $204,312 $6,350 n/a