IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0489 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $870 $1,000 Not Implemented
MA0489 # 06 Y:2001 06 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $170 $120 Not Implemented
MI0018 # 01 Y:2001 01 2001 INSTALL SET-BACK TIMERS $7,803 $7,764 Implemented
MI0018 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,179 $208 Implemented
MI0018 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $34,167 $13 Implemented
MI0018 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,070 $312 Implemented
MI0018 # 05 Y:2001 05 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,698 $13 Implemented
MI0018 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,572 $208 Implemented
MI0018 # 07 Y:2001 07 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,065 $13 Implemented
MI0018 # 08 Y:2001 08 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $60,908 $5,100 Not Implemented
SU0117 # 01 Y:2001 01 2001 ELIMINATE/REDUCE AN OPERATION $7,264 $8,085 Not Implemented
SU0117 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $768 $0 Implemented
SU0117 # 03 Y:2001 03 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $153,410 $531,678 Not Implemented
SU0117 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $12,307 $30,550 Not Implemented
SU0117 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,845 $158 Implemented
SU0117 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,016 $0 Not Implemented
SU0117 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,888 $20,600 Implemented
TA0011 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,600 $0 Implemented
TA0011 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $2,340 $360 Implemented
TA0011 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,645 $400 Implemented
TA0011 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $210 Implemented
TA0011 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $715 $0 Not Implemented
MI0017 # 01 Y:2001 01 2001 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $91,260 $30 Implemented
MI0017 # 02 Y:2001 02 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $60,831 $6,664 Not Implemented
MI0017 # 03 Y:2001 03 2001 ELIMINATE/REDUCE AN OPERATION $6,170 $120 Implemented