IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0311 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,682 $3,759 Implemented
SU0311 # 04 Y:2011 04 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,617 $15,000 Not Implemented
SU0311 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,276 $19,890 Implemented
SU0311 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $111 $313 Not Implemented
SU0311 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $2,386 $21,091 Implemented
UM0387 # 01 Y:2011 01 2011 OPERATE BOILERS ON HIGH FIRE SETTING $48,827 $157,500 Not Implemented
UM0387 # 02 Y:2011 02 2011 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $139,284 $750,000 Not Implemented
UM0387 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $131,444 $85,000 Not Implemented
UM0387 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $57,295 $12,490 Not Implemented
UM0387 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $21,900 $55,250 Not Implemented
IC0183 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,319 $0 n/a
IC0183 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $503 n/a
IC0183 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $328 $2,003 n/a
IC0183 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,540 $81,305 n/a
IC0183 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,481 $43,841 n/a
IC0183 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $426 n/a
IC0183 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $363 $0 n/a
IC0183 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $1,035 n/a
IC0183 # 09 Y:2011 09 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17 $0 n/a
UA0061 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223,288 $22,500 Implemented
UA0061 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $224,396 $387,720 Not Implemented
UA0061 # 03 Y:2011 03 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,256 $85,000 Not Implemented
UA0061 # 04 Y:2011 04 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $98,700 $112,800 Not Implemented
UA0061 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $164,422 $19,809 Not Implemented
UA0061 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $411,224 $71,550 Not Implemented