Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0886 # 16 Y:2013 | 16 | 2013 | REDUCE VENTILATION AIR | $32,467 | $20,000 | Not Implemented |
TT0117 # 01 Y:2013 | 01 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $8,640 | $0 | Implemented |
TT0117 # 02 Y:2013 | 02 | 2013 | DISCONNECT BALLASTS | $517 | $0 | Not Implemented |
TT0117 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,012 | $90 | Implemented |
TT0117 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $22,871 | $6,600 | Implemented |
TT0117 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $132 | $233 | Implemented |
TT0117 # 06 Y:2013 | 06 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,770 | $7,200 | Implemented |
TT0117 # 07 Y:2013 | 07 | 2013 | INSULATE BARE EQUIPMENT | $3,376 | $7,150 | Implemented |
SU0347 # 03 Y:2013 | 03 | 2013 | ELIMINATE/REDUCE AN OPERATION | $10,027 | $5,789 | Not Implemented |
SU0347 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $491 | $935 | Not Implemented |
SU0347 # 05 Y:2013 | 05 | 2013 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $185 | $570 | Not Implemented |
MI0245 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30,611 | $1,800 | Implemented |
MI0245 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $26,976 | $407 | Not Implemented |
MI0245 # 03 Y:2013 | 03 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $24,698 | $160 | Implemented |
MI0245 # 04 Y:2013 | 04 | 2013 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $13,325 | $13,200 | Implemented |
MI0245 # 05 Y:2013 | 05 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $12,407 | $1,680 | Implemented |
MI0245 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,737 | $1,660 | Implemented |
MI0245 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,337 | $80 | Implemented |
MI0245 # 08 Y:2013 | 08 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,960 | $7,502 | Implemented |
MI0245 # 09 Y:2013 | 09 | 2013 | INSTALL OCCUPANCY SENSORS | $2,930 | $896 | Not Implemented |
MI0245 # 10 Y:2013 | 10 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,980 | $440 | Not Implemented |
MI0245 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,631 | $3,190 | Implemented |
MI0245 # 12 Y:2013 | 12 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,214 | $1,694 | Implemented |
MI0245 # 13 Y:2013 | 13 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $684 | $2,000 | Not Implemented |
CO0671 # 01 Y:2013 | 01 | 2013 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $62,960 | $65,530 | Implemented |