Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28,131
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0612 # 01 Y:2021 | 01 | 2021 | REDESIGN PROCESS | $39,942 | $13,000 | Implemented |
SD0612 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,879 | $12,356 | Implemented |
SD0612 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,826 | $9,545 | Implemented |
SD0612 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $957 | $0 | Implemented |
SD0612 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,530 | $9,245 | Not Implemented |
SD0612 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,883 | $2,800 | Not Implemented |
SD0612 # 07 Y:2021 | 07 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,829 | $44,568 | Not Implemented |
SD0612 # 08 Y:2021 | 08 | 2021 | REPAIR AND ELIMINATE STEAM LEAKS | $557 | $1,000 | Implemented |
OR0742 # 01 Y:2021 | 01 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,010 | $0 | Implemented |
OR0742 # 02 Y:2021 | 02 | 2021 | REDESIGN PROCESS | $3,895 | $0 | Implemented |
OR0742 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,662 | $6,857 | Not Implemented |
OR0742 # 04 Y:2021 | 04 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,200 | $38,018 | Not Implemented |
MZ0311 # 01 Y:2021 | 01 | 2021 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $84,037 | $10,000 | Implemented |
MZ0311 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,212 | $8,080 | Not Implemented |
MZ0311 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,622 | $21,780 | Implemented |
WV0611 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,448 | $734 | Implemented |
WV0611 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,923 | $240 | Implemented |
WV0611 # 03 Y:2021 | 03 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,803 | $3,254 | Implemented |
WV0611 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,767 | $2,029 | Not Implemented |
WV0611 # 05 Y:2021 | 05 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $1,003 | $761 | Implemented |
WV0611 # 06 Y:2021 | 06 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $830 | $4,080 | Not Implemented |
WV0611 # 07 Y:2021 | 07 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $1,213 | Not Implemented |
WV0611 # 08 Y:2021 | 08 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $191 | $29 | Implemented |
LS2115 # 05 Y:2021 | 05 | 2021 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $844 | $300 | Not Implemented |
LS2115 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,076 | $451 | Not Implemented |