Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0022 # 09 Y:2008 | 09 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,504 | $1,845 | Implemented |
DL0013 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,300 | $0 | Implemented |
DL0013 # 02 Y:2008 | 02 | 2008 | INSTALL OCCUPANCY SENSORS | $2,396 | $285 | Implemented |
DL0013 # 03 Y:2008 | 03 | 2008 | INSULATE BARE EQUIPMENT | $108,300 | $104,800 | Implemented |
DL0013 # 04 Y:2008 | 04 | 2008 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $24,218 | $25,000 | Implemented |
DL0013 # 05 Y:2008 | 05 | 2008 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,700 | $10,000 | Implemented |
MI0167 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $53,872 | $3,640 | Implemented |
MI0167 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $48,995 | $132,686 | Implemented |
MI0167 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,111 | $61,964 | Implemented |
MI0167 # 04 Y:2008 | 04 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,032 | $5,700 | Implemented |
MI0167 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,393 | $1,210 | Implemented |
MI0167 # 06 Y:2008 | 06 | 2008 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $7,627 | $15,500 | Implemented |
LL0294 # 01 Y:2008 | 01 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $31,560 | $45,800 | Not Implemented |
LL0294 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $16,326 | $5,201 | Not Implemented |
LL0294 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,541 | $10,640 | Not Implemented |
LL0294 # 04 Y:2008 | 04 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,897 | $1,210 | Implemented |
LL0294 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $4,740 | $2,539 | Not Implemented |
LL0294 # 06 Y:2008 | 06 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,006 | $1,880 | Not Implemented |
LL0294 # 07 Y:2008 | 07 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,841 | $210 | Not Implemented |
LL0294 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $645 | $90 | Implemented |
LL0294 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $527 | $350 | Not Implemented |
UW0018 # 01 Y:2008 | 01 | 2008 | UTILIZE JOB COSTING SOFTWARE | $55,734 | $72,000 | Not Implemented |
UW0018 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,434 | $34,000 | Not Implemented |
UW0018 # 03 Y:2008 | 03 | 2008 | USE OPTIMUM THICKNESS INSULATION | $9,391 | $39,900 | Not Implemented |
UW0018 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,375 | $4,328 | Not Implemented |