IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0312 # 02 Y:2006 02 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,289 $4,200 Not Implemented
UM0312 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,355 $15,984 Not Implemented
UM0312 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,421 $100 Not Implemented
UM0312 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,885 $2,250 Implemented
UM0312 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,862 $200 Not Implemented
UM0312 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,826 $1,300 Not Implemented
UM0312 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,622 $800 Not Implemented
UM0312 # 09 Y:2006 09 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $857 $300 Not Implemented
UM0312 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $508 $276 Not Implemented
UM0307 # 01 Y:2006 01 2006 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $302,929 $70,000 Implemented
UM0307 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $219,438 $0 Not Implemented
UM0307 # 03 Y:2006 03 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $63,131 $0 Implemented
UM0307 # 04 Y:2006 04 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $55,043 $2,400 Implemented
UM0307 # 05 Y:2006 05 2006 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $19,061 $5,066 Implemented
UM0307 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,621 $1,500 Implemented
UM0307 # 07 Y:2006 07 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,914 $5,000 Not Implemented
UM0307 # 08 Y:2006 08 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,428 $2,000 Implemented
UM0307 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,814 $10,054 Implemented
UM0307 # 10 Y:2006 10 2006 INSULATE BARE EQUIPMENT $3,606 $1,191 Implemented
UM0307 # 11 Y:2006 11 2006 RECOVER WASTE HEAT FROM EQUIPMENT $3,358 $2,100 Not Implemented
UM0307 # 12 Y:2006 12 2006 INSULATE BARE EQUIPMENT $3,085 $0 Implemented
UM0307 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $754 $75 Implemented
UM0306 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,385 $2,500 Implemented
UM0306 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,812 $22,458 Not Implemented
UM0306 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,934 $2,500 Not Implemented