IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0175 # 11 Y:1999 11 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $54,584 $130,000 Not Implemented
SF0175 # 12 Y:1999 12 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $110,720 $322,185 Not Implemented
SF0175 # 13 Y:1999 13 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $97,553 $950,000 Not Implemented
OR0354 # 01 Y:1999 01 1999 CLOSE OFF UNNEEDED STEAM LINES $5,250 $950 Implemented
OR0354 # 02 Y:1999 02 1999 USE MINIMUM STEAM OPERATING PRESSURE $560 $0 Not Implemented
OR0354 # 03 Y:1999 03 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $750 $500 Implemented
OR0354 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $2,049 Implemented
OR0354 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $950 $0 Not Implemented
UL0228 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,001 $20 Implemented
UL0228 # 02 Y:1999 02 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,550 $0 Not Implemented
UL0228 # 03 Y:1999 03 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $9,641 $10,400 Not Implemented
UL0228 # 04 Y:1999 04 1999 USE LESS WASTEFUL PACKAGING $58,958 $1,000 Not Implemented
UL0228 # 05 Y:1999 05 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $88,740 $1,560 Not Implemented
UL0228 # 06 Y:1999 06 1999 SCHEDULE DELIVERIES ACCORDING TO DEMAND $250,000 $0 Not Implemented
UM0148 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,826 $2,464 Implemented
UM0148 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,069 $500 Not Implemented
UM0148 # 03 Y:1999 03 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,056 $40,000 Not Implemented
UM0148 # 04 Y:1999 04 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $12,311 $40,000 Implemented
UM0148 # 05 Y:1999 05 1999 EXPAND OPERATIONS INTO UNUSED SPACE $342,900 $683,000 Not Implemented
GT0670 # 01 Y:1999 01 1999 COMBINE UTILITY METERS $512 $0 Implemented
GT0670 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,226 $0 Implemented
GT0670 # 03 Y:1999 03 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $370 $0 Not Implemented
GT0670 # 04 Y:1999 04 1999 INSTALL AUTOMATIC STACK DAMPER $3,388 $750 Not Implemented
GT0670 # 05 Y:1999 05 1999 INSTALL COMMON HEADER ON COMPRESSORS $30,991 $5,250 Implemented
GT0670 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,078 $15,000 Implemented