IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0307 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,754 $2,000 Not Implemented
UF0307 # 06 Y:2002 06 2002 ELIMINATE THIRD SHIFT $11,540 $0 Not Implemented
UF0307 # 07 Y:2002 07 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $39,511 $50 Not Implemented
UF0307 # 08 Y:2002 08 2002 RECYCLE FLUORESCENT LAMPS $1,147 $1,895 Not Implemented
UF0307 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $37,098 $15,000 Not Implemented
UM0220 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,258 $25,000 Not Implemented
UM0220 # 02 Y:2002 02 2002 MAINTAIN MACHINES TO REDUCE LEAKS $7,380 $1,150 Implemented
UM0220 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $1,700 Implemented
UM0220 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,947 $2,064 Not Implemented
UM0220 # 05 Y:2002 05 2002 AIR CONDITION ONLY SPACE NECESSARY $4,385 $800 Not Implemented
UM0220 # 06 Y:2002 06 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,928 $2,400 Not Implemented
UM0220 # 07 Y:2002 07 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,690 $10,000 Not Implemented
MA0516 # 01 Y:2002 01 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $151,365 $135,000 Implemented
MA0516 # 02 Y:2002 02 2002 MINIMIZE WATER USAGE $43,582 $43,100 Not Implemented
MA0516 # 03 Y:2002 03 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $14,155 $19,000 Not Implemented
MA0516 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $5,343 $8,400 Implemented
MA0516 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,745 $460 Implemented
MA0516 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,589 $5,200 Implemented
MA0516 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $966 $625 Implemented
MA0516 # 08 Y:2002 08 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $560 $0 Not Implemented
MA0516 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,704 $15,768 Not Implemented
AS0331 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $4,752 $3,880 Not Implemented
AS0331 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $17,275 $26,928 Not Implemented
AS0331 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,966 $20 Implemented
AS0331 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $34,077 $400 Not Implemented