Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0219 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,356 | $0 | Implemented |
SU0219 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,286 | $502 | Implemented |
SU0219 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,948 | $721 | Implemented |
SU0219 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,969 | $38,400 | Not Implemented |
SU0219 # 07 Y:2005 | 07 | 2005 | DISCONNECT BALLASTS | $6,107 | $5,363 | Implemented |
SU0219 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $1,137 | $1,726 | Not Implemented |
SU0219 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $694 | $1,262 | Not Implemented |
SU0219 # 10 Y:2005 | 10 | 2005 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $276 | $509 | Not Implemented |
SU0219 # 11 Y:2005 | 11 | 2005 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $53,360 | $111,859 | Not Implemented |
SU0219 # 12 Y:2005 | 12 | 2005 | ADD AREA LIGHTING SWITCHES | $4,267 | $10,645 | Implemented |
SU0219 # 13 Y:2005 | 13 | 2005 | OPTIMIZE PLANT POWER FACTOR | $2,894 | $17,500 | Not Implemented |
UM0286 # 01 Y:2005 | 01 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $9,539 | $27,000 | Not Implemented |
UM0286 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,301 | $13,476 | Not Implemented |
UM0286 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,775 | $1,900 | Implemented |
UM0286 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,376 | $450 | Implemented |
UM0286 # 05 Y:2005 | 05 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,619 | $500 | Not Implemented |
UM0286 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,608 | $75 | Implemented |
UM0286 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $618 | $736 | Not Implemented |
UM0286 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $352 | $1,000 | Not Implemented |
UM0286 # 09 Y:2005 | 09 | 2005 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $100 | $45 | Implemented |
MA0582 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,511 | $312,103 | Not Implemented |
MA0582 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,163 | $86,315 | Implemented |
MA0582 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,630 | $6,540 | Implemented |
MA0582 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,153 | $0 | Implemented |
MA0582 # 05 Y:2005 | 05 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,602 | $77,760 | Not Implemented |