IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0735 # 02 Y:2020 02 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,510 $2,925 Not Implemented
OR0735 # 03 Y:2020 03 2020 UPGRADE CONTROLS ON COMPRESSORS $3,031 $0 Implemented
SU0498 # 01 Y:2020 01 2020 REDUCE VENTILATION AIR $6,925 $882 Not Implemented
SU0498 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $325 $60 Not Implemented
SU0498 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $22,525 $4,900 Not Implemented
SU0498 # 04 Y:2020 04 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $346 $85 Not Implemented
SU0498 # 05 Y:2020 05 2020 DISCONNECT BALLASTS $81 $30 Not Implemented
SU0498 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $427 Not Implemented
SU0498 # 07 Y:2020 07 2020 USE PHOTOCELL CONTROLS $380 $615 Not Implemented
SU0498 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,979 $18,397 Not Implemented
MA0817 # 01 Y:2020 01 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,919 $5,650 Implemented
MA0817 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,876 $50 Implemented
MA0817 # 03 Y:2020 03 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,042 $100 Not Implemented
MA0817 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $387 $1,503 Implemented
IC0238 # 01 Y:2020 01 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,874 $24,382 Not Implemented
IC0238 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,907 $5,000 Not Implemented
IC0238 # 03 Y:2020 03 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $781 $1,758 Not Implemented
IC0238 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,791 $83 Not Implemented
IC0238 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $979 $240 Not Implemented
AS0484 # 01 Y:2020 01 2020 Install Anaerobic Digester $1,259,928 $10,007,562 Implemented
AS0484 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $61,233 $231,375 Not Implemented
AS0484 # 03 Y:2020 03 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $26,610 $79,200 Implemented
AS0484 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,035 $5,600 Not Implemented
OR0734 # 01 Y:2020 01 2020 INCREASE USE OF AUTOMATION $126,455 $360,000 Not Implemented
OR0734 # 02 Y:2020 02 2020 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $44,429 $117,388 Not Implemented