IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,776

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0015 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,011 $16,913 Not Implemented
TT0014 # 01 Y:2007 01 2007 INSTALL OCCUPANCY SENSORS $541 $360 Not Implemented
TT0014 # 02 Y:2007 02 2007 APPLY FOR INVESTMENT INCENTIVES $21,551 $110 Implemented
TT0014 # 03 Y:2007 03 2007 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,359 $1,200 Not Implemented
TT0014 # 04 Y:2007 04 2007 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $44,581 $51,000 Implemented
TT0014 # 05 Y:2007 05 2007 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $159,283 $2,912 Implemented
TT0012 # 01 Y:2007 01 2007 REPAIR AND ELIMINATE STEAM LEAKS $331 $600 Implemented
TT0012 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,237 $200 Implemented
TT0012 # 03 Y:2007 03 2007 Leaks and Insulation $9,860 $1,491 Implemented
TT0012 # 04 Y:2007 04 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $31,671 $79,800 Not Implemented
TT0012 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $343 $868 Implemented
TT0012 # 06 Y:2007 06 2007 $648 $1,275 Not Implemented
TT0012 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $45,660 $28,527 Not Implemented
TT0012 # 08 Y:2007 08 2007 $2,490 $1,019 Not Implemented
TT0011 # 01 Y:2007 01 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,000 $5,000 Implemented
TT0011 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,054 $559,252 Not Implemented
TT0011 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $133 $60 Implemented
TT0008 # 01 Y:2007 01 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $930 $2,000 Not Implemented
TT0008 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $110 Implemented
TT0008 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $1,200 $300 Implemented
TT0008 # 04 Y:2007 04 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $741 $350 Not Implemented
TT0008 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,000 $1,500 Not Implemented
TT0008 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $563 $100 Implemented
TT0007 # 01 Y:2007 01 2007 USE COMPRESSOR AIR FILTERS $25,442 $42,225 Not Implemented
TT0007 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,000 $10,900 Not Implemented