Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AR0148 # 07 Y:1998 | 07 | 1998 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,600 | $6,000 | Not Implemented |
AR0148 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,787 | $1,000 | Implemented |
AR0148 # 09 Y:1998 | 09 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,143 | $0 | Not Implemented |
OR0322 # 01 Y:1998 | 01 | 1998 | REDUCE SCRAP PRODUCTION | $22,000 | $12,480 | Implemented |
OR0322 # 02 Y:1998 | 02 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $1,960 | $180 | Not Implemented |
OR0322 # 03 Y:1998 | 03 | 1998 | OPTIMIZE PLANT POWER FACTOR | $3,399 | $5,800 | Not Implemented |
OR0322 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,116 | $1,000 | Not Implemented |
NC0144 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,673 | $14,934 | Not Implemented |
NC0144 # 02 Y:1998 | 02 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,664 | $1,000 | Implemented |
NC0144 # 03 Y:1998 | 03 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,696 | $12,000 | Not Implemented |
NC0144 # 04 Y:1998 | 04 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,617 | $4,731 | Implemented |
NC0144 # 05 Y:1998 | 05 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $113 | $200 | Implemented |
NC0144 # 06 Y:1998 | 06 | 1998 | METER WASTE WATER | $1,464 | $200 | Implemented |
NC0144 # 07 Y:1998 | 07 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $5,550 | $2,700 | Implemented |
NC0144 # 08 Y:1998 | 08 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $2,325 | $12,000 | Not Implemented |
NV0110 # 01 Y:1998 | 01 | 1998 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $346 | $133 | n/a |
NV0110 # 02 Y:1998 | 02 | 1998 | REPLACE BOILER | $3,636 | $17,539 | n/a |
NV0110 # 03 Y:1998 | 03 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $450 | $1,239 | n/a |
NV0110 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $721 | $2,864 | n/a |
NV0110 # 05 Y:1998 | 05 | 1998 | INSTALL AUTOMATIC PACKING EQUIPMENT | $6,200 | $140 | n/a |
NV0110 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $877 | $100 | n/a |
NV0110 # 07 Y:1998 | 07 | 1998 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,073 | $193 | n/a |
NV0110 # 08 Y:1998 | 08 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $10,351 | $1,000 | n/a |
OR0327 # 01 Y:1998 | 01 | 1998 | CLEAR AND RENT EXISTING SPACE | $176,000 | $200,000 | Implemented |
OR0327 # 02 Y:1998 | 02 | 1998 | INSTALL SENSORS TO DETECT DEFECTS | $20,040 | $2,745 | Not Implemented |