IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0582 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,599 $2,010 Implemented
MA0582 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,815 $7,660 Implemented
MA0582 # 08 Y:2005 08 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,340 $25,150 Implemented
MA0582 # 09 Y:2005 09 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,540 $800 Implemented
MA0582 # 10 Y:2005 10 2005 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,584 $1,300 Implemented
LL0231 # 01 Y:2005 01 2005 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $25,544 $0 Not Implemented
LL0231 # 02 Y:2005 02 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,617 $500 Implemented
LL0231 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,216 $750 Implemented
LL0231 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,367 $0 Not Implemented
LL0231 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $165 $0 Not Implemented
LL0231 # 06 Y:2005 06 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $108,500 $0 Not Implemented
LL0231 # 07 Y:2005 07 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $390 $0 Not Implemented
SF0310 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,347 $480 Not Implemented
SF0310 # 02 Y:2005 02 2005 REPAIR AND ELIMINATE STEAM LEAKS $728 $120 Not Implemented
SF0310 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,633 $3,457 Not Implemented
SF0310 # 04 Y:2005 04 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,150 $2,900 Not Implemented
SF0310 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,456 $1,635 Not Implemented
SF0310 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,570 $1,687 Not Implemented
SF0310 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,218 $24,484 Not Implemented
SF0310 # 08 Y:2005 08 2005 UPGRADE CONTROLS ON COMPRESSORS $6,777 $18,995 Not Implemented
SF0310 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,603 $14,240 Not Implemented
SF0310 # 10 Y:2005 10 2005 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $38,197 $66,900 Not Implemented
LL0229 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,286 $0 Not Implemented
LL0229 # 02 Y:2005 02 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,439 $0 Not Implemented
LL0229 # 03 Y:2005 03 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,224 $170 Implemented