IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0360 # 05 Y:2007 05 2007 DEVELOP A REPAIR/REPLACE POLICY $5,516 $1,900 Implemented
WV0360 # 06 Y:2007 06 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,399 $1,000 Implemented
WV0360 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,158 $400 Not Implemented
WV0360 # 08 Y:2007 08 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,676 $3,700 Implemented
WV0360 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $25 Implemented
WV0360 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,930 $300 Implemented
WV0360 # 11 Y:2007 11 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,426 $900 Implemented
MZ0003 # 01 Y:2007 01 2007 REPLACE BOILER $237,208 $220,000 Not Implemented
MZ0003 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,702 $7,764 Not Implemented
MZ0003 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,859 $30,000 Not Implemented
MZ0003 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $45,032 $4,012 Not Implemented
MZ0003 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $5,992 $2,950 Not Implemented
MZ0003 # 06 Y:2007 06 2007 ADD AREA LIGHTING SWITCHES $3,995 $500 Not Implemented
IA0407 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132,474 $185,735 Not Implemented
IA0407 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,098 $4,794 Implemented
IA0407 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,719 $38,791 Implemented
IA0407 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $3,657 $4,543 Implemented
IA0407 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,366 $1,000 Implemented
IA0407 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,084 $12,025 Implemented
IA0407 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,709 $16,692 Not Implemented
OK0747 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,165 $4,559 Implemented
OK0747 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $991 $326 Not Implemented
OK0747 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,756 $0 Not Implemented
OK0747 # 04 Y:2007 04 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,099 $0 Not Implemented
OK0747 # 05 Y:2007 05 2007 USE SOLAR HEAT FOR HEAT $14,978 $138,320 Not Implemented