Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0360 # 05 Y:2007 | 05 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $5,516 | $1,900 | Implemented |
WV0360 # 06 Y:2007 | 06 | 2007 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,399 | $1,000 | Implemented |
WV0360 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,158 | $400 | Not Implemented |
WV0360 # 08 Y:2007 | 08 | 2007 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,676 | $3,700 | Implemented |
WV0360 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,188 | $25 | Implemented |
WV0360 # 10 Y:2007 | 10 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,930 | $300 | Implemented |
WV0360 # 11 Y:2007 | 11 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,426 | $900 | Implemented |
MZ0003 # 01 Y:2007 | 01 | 2007 | REPLACE BOILER | $237,208 | $220,000 | Not Implemented |
MZ0003 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,702 | $7,764 | Not Implemented |
MZ0003 # 03 Y:2007 | 03 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,859 | $30,000 | Not Implemented |
MZ0003 # 04 Y:2007 | 04 | 2007 | DISCONNECT BALLASTS | $45,032 | $4,012 | Not Implemented |
MZ0003 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $5,992 | $2,950 | Not Implemented |
MZ0003 # 06 Y:2007 | 06 | 2007 | ADD AREA LIGHTING SWITCHES | $3,995 | $500 | Not Implemented |
SD0395 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,816 | $8,425 | Implemented |
SD0395 # 02 Y:2007 | 02 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,658 | $13,350 | Not Implemented |
SD0395 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,155 | $240 | Implemented |
SD0395 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,081 | $1,213 | Not Implemented |
SD0395 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $3,878 | $3,400 | Implemented |
SD0395 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $659 | $1,146 | Not Implemented |
IA0407 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $132,474 | $185,735 | Not Implemented |
IA0407 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,098 | $4,794 | Implemented |
IA0407 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,719 | $38,791 | Implemented |
IA0407 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $3,657 | $4,543 | Implemented |
IA0407 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,366 | $1,000 | Implemented |
IA0407 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,084 | $12,025 | Implemented |