IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0451 # 15 Y:2012 15 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,001 $467 Not Implemented
WV0451 # 16 Y:2012 16 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $783 $70 Implemented
MA0697 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $82,439 $22,540 Not Implemented
MA0697 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $67,234 $180,000 Not Implemented
MA0697 # 03 Y:2012 03 2012 IMPROVE COMBUSTION CONTROL CAPABILITY $23,122 $100,000 Not Implemented
MA0697 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $10,370 $3,000 Implemented
MA0697 # 05 Y:2012 05 2012 PAY UTILITY BILLS ON TIME $11,678 $500 Implemented
MA0697 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,779 $3,600 Implemented
MA0697 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,452 $8,700 Not Implemented
MA0697 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $659 $500 Not Implemented
NC0457 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,926 $7,711 Implemented
NC0457 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $415 $525 Implemented
NC0457 # 03 Y:2012 03 2012 LOWER CEILING TO REDUCE CONDITIONED SPACE $19,472 $40,000 Not Implemented
NC0457 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $508 $400 Implemented
NC0457 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,516 $0 Implemented
NC0457 # 06 Y:2012 06 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,161 $2,000 Not Implemented
WV0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,277 $41,953 Not Implemented
WV0451 # 02 Y:2012 02 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,271 $1,000 Not Implemented
WV0451 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $5,773 Implemented
WV0451 # 04 Y:2012 04 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,597 $27,000 Not Implemented
WV0451 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,858 $380 Implemented
WV0451 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $3,732 $1,737 Implemented
WV0451 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,357 $5,400 Not Implemented
WV0451 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,273 $10,200 Implemented
WV0451 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,705 $9,700 Not Implemented