IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,937

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0683 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $197 $352 Implemented
UL0240 # 01 Y:2000 01 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,535 $0 Not Implemented
UL0240 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,065 $20 Not Implemented
UL0240 # 03 Y:2000 03 2000 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $1,113 $700 Not Implemented
UL0240 # 04 Y:2000 04 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $2,314 $4,150 Not Implemented
UL0240 # 05 Y:2000 05 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $1,410 $384 Not Implemented
TN0680 # 01 Y:2000 01 2000 BURN A LESS EXPENSIVE GRADE OF FUEL $75,400 $400,000 Not Implemented
TN0680 # 02 Y:2000 02 2000 MODIFY CURRENT INCENTIVE PROGRAM $37,500 $16,430 Implemented
TN0680 # 03 Y:2000 03 2000 DEVELOP A REPAIR/REPLACE POLICY $30,832 $1,075 Not Implemented
TN0680 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,356 $18,370 Not Implemented
TN0680 # 05 Y:2000 05 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,810 $500 Implemented
TN0680 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $960 $0 Not Implemented
UL0238 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,743 $0 Not Implemented
UL0238 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $12,291 $1,236 Implemented
UL0238 # 03 Y:2000 03 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $15,288 $80,000 Not Implemented
TN0674 # 01 Y:2000 01 2000 MAKE A NEW BY-PRODUCT $466,160 $455,420 Not Implemented
TN0674 # 02 Y:2000 02 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $249,860 $667,440 Not Implemented
TN0674 # 03 Y:2000 03 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $42,930 $25,500 Not Implemented
TN0674 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,490 $750 Implemented
TN0674 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,380 $500 Implemented
UL0230 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,394 $40 Implemented
UL0230 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $500 Implemented
UL0230 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,860 $0 Not Implemented
UL0230 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,447 $0 Not Implemented
UL0230 # 05 Y:1999 05 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $297,462 $167,000 Not Implemented