IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0336 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $3,716 $10,200 Not Implemented
OR0331 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,374,400 $105,000 Implemented
OR0331 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,781 $1,000 Implemented
OR0331 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $78,861 $26,602 Not Implemented
OR0331 # 04 Y:1998 04 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $14,990 $79,750 Not Implemented
OR0331 # 05 Y:1998 05 1998 OPTIMIZE PLANT POWER FACTOR $0 $136,000 Not Implemented
OR0337 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $44,432 $21,400 Not Implemented
OR0337 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,060 $0 Implemented
OR0337 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $9,949 $13,663 Implemented
OR0337 # 04 Y:1999 04 1999 USE LESS WASTEFUL PACKAGING $34,000 $73,000 Not Implemented
OR0337 # 05 Y:1999 05 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,000 $28,700 Implemented
OR0338 # 01 Y:1999 01 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $14,000 $1,630 Implemented
OR0338 # 02 Y:1999 02 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $229,748 $79,349 Not Implemented
OR0338 # 03 Y:1999 03 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $6,574 $15,045 Not Implemented
OR0338 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $9,244 $1,831 Not Implemented
OR0338 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $11,400 $12,250 Not Implemented
OR0338 # 06 Y:1999 06 1999 USE OPTIMUM THICKNESS INSULATION $1,900 $1,810 Not Implemented
OR0335 # 01 Y:1998 01 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $347,930 $644,800 Not Implemented
OR0335 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,045 $1,000 Implemented
OR0335 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,260 $0 Not Implemented
OR0335 # 04 Y:1998 04 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $310 $0 Implemented
OR0334 # 01 Y:1998 01 1998 CONDENSE OPERATION INTO ONE BUILDING $1,080,150 $1,000,000 Implemented
OR0334 # 02 Y:1998 02 1998 INSTALL EQUIPMENT TO MOVE PRODUCT $14,550 $31,520 Implemented
OR0334 # 03 Y:1998 03 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $48,900 $220,000 Not Implemented
OR0334 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $15,977 $44,400 Not Implemented