IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0939 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $1,731 $5,940 Not Implemented
OK0939 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,707 $0 Not Implemented
OK0939 # 05 Y:2016 05 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,509 $100 Not Implemented
OK0939 # 06 Y:2016 06 2016 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,761 $0 Implemented
IP0068 # 01 Y:2016 01 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $759 $4 Implemented
IP0068 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $688 $5 Implemented
IP0068 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $720 $38 Not Implemented
IP0068 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $491 $159 Implemented
IP0068 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $500 $285 Implemented
IP0068 # 06 Y:2016 06 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $136 $82 Not Implemented
IP0068 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,287 $5,648 Implemented
IP0068 # 08 Y:2016 08 2016 OPTIMIZE PLANT POWER FACTOR $3,317 $10,850 Not Implemented
IP0068 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $196 $940 Not Implemented
UD0949 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,312 $5,400 Implemented
UD0949 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,698 $2,125 Not Implemented
UD0949 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,691 $2,800 Not Implemented
UD0949 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $9,976 $4,120 Not Implemented
UD0949 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $1,000 Implemented
UD0949 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $66 $500 Not Implemented
UD0949 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,996 $57,770 Implemented
WM0086 # 01 Y:2016 01 2016 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $3,034 $400 Not Implemented
WM0086 # 02 Y:2016 02 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,302 $4,004 Not Implemented
WM0086 # 03 Y:2016 03 2016 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $533 $276 Not Implemented
WM0086 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $548 $318 Not Implemented
WM0086 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $258 $200 Not Implemented