Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1804 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,927 | $14,880 | Not Implemented |
LS1804 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20 | $80 | Not Implemented |
MZ0251 # 01 Y:2018 | 01 | 2018 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $22,536 | $32,400 | Not Implemented |
MZ0251 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $688 | $75 | Implemented |
MZ0251 # 03 Y:2018 | 03 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $862 | $1,160 | Implemented |
MZ0251 # 04 Y:2018 | 04 | 2018 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,719 | $36,000 | Not Implemented |
MZ0251 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,018 | $0 | Implemented |
MZ0251 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,153 | $6,140 | Implemented |
CL1804 # 01 Y:2018 | 01 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $156,853 | $28,500 | Implemented |
CL1804 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,306 | $184,601 | Implemented |
CL1804 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $42,335 | $15,500 | Not Implemented |
CL1804 # 04 Y:2018 | 04 | 2018 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $39,409 | $3,050 | Implemented |
CL1804 # 05 Y:2018 | 05 | 2018 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,121 | $34,121 | Not Implemented |
IP0100 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $31,439 | $2 | Implemented |
IP0100 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,249 | $7 | Not Implemented |
IP0100 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $831 | $0 | Not Implemented |
IP0100 # 04 Y:2018 | 04 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,491 | $1,482 | Implemented |
IP0100 # 05 Y:2018 | 05 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,641 | $800 | Implemented |
IP0100 # 06 Y:2018 | 06 | 2018 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,530 | $11,407 | Not Implemented |
IP0100 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $323 | $87 | Implemented |
IP0100 # 08 Y:2018 | 08 | 2018 | OPTIMIZE PLANT POWER FACTOR | $59,133 | $75,790 | Implemented |
SU0458 # 04 Y:2018 | 04 | 2018 | REPLACE BOILER | $101,732 | $175,000 | Implemented |
SU0458 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $146 | Implemented |
SU0458 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $258 | Implemented |
SU0458 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $189 | $580 | Not Implemented |