IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,315

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0206 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $691 $2,632 Implemented
IA0205 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,263 $51,347 Not Implemented
IA0205 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,633 $3,261 Implemented
IA0205 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $67 $100 Not Implemented
IA0205 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $950 Not Implemented
IA0205 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $211 $310 Not Implemented
IA0205 # 06 Y:1998 06 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,860 $400 Implemented
IA0205 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,680 $5,250 Implemented
IA0205 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $119,822 $290,000 Implemented
IA0205 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $42,573 $15,000 Not Implemented
IA0205 # 10 Y:1998 10 1998 ELIMINATE/REDUCE AN OPERATION $38,166 $2,000 Implemented
IA0204 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $8,258 $1,910 Implemented
IA0204 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,851 $500 Implemented
IA0204 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $298 $446 Not Implemented
IA0204 # 04 Y:1998 04 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,222 $566 Implemented
IA0204 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,390 $150 Not Implemented
IA0204 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,346 $69 Implemented
IA0204 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,283 $3,501 Not Implemented
IA0204 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $786 $1,116 Implemented
IA0204 # 09 Y:1998 09 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,158 $25 Not Implemented
IA0204 # 10 Y:1998 10 1998 INSTALL OCCUPANCY SENSORS $1,026 $1,396 Not Implemented
IA0204 # 11 Y:1998 11 1998 RECOVER AND REUSE WASTE MATERIAL $1,040 $400 Implemented
IA0204 # 12 Y:1998 12 1998 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,196 $96 Implemented
IA0204 # 13 Y:1998 13 1998 AUTOMATE FINISHING PROCESS $268,205 $395,000 Not Implemented
IA0204 # 14 Y:1998 14 1998 AUTOMATE FINISHING PROCESS $190,000 $100,000 Implemented